我的商店
S20 GPS Tracker with Real-Time Tracking, 6000mAh Battery, 4G LTE & IPx5 Waterproof for Vehicles/Assets GPS Tracker S20 - 4G LTE Real-Time Location Tracker, 6000mAh Rechargeable, IPx5 Waterproof, Global Coverage for Cars/Kids/Elderly
S20 GPS Tracker with Real-Time Tracking, 6000mAh Battery, 4G LTE & IPx5 Waterproof for Vehicles/Assets GPS Tracker S20 - 4G LTE Real-Time Location Tracker, 6000mAh Rechargeable, IPx5 Waterproof, Global Coverage for Cars/Kids/Elderly
Couldn't load pickup availability
Highlights:
✅ Real-Time GPS Tracking: MTK2503 chip supports GPS + LBS dual-mode positioning with 20 channels for ultra-fast cold start (38s) and hot start (2s).
✅ 6000mAh Long-Lasting Battery: Up to 30 days standby time (5mA standby power) and 7-10 days active tracking (50mA working power).
✅ IPx5 Waterproof & Durable: Built for outdoor use, withstands rain, dust, and extreme temperatures (-25℃ to 80℃).
✅ Global 4G LTE Compatibility: Supports 2G/3G/4G networks worldwide. Subscription plans available for USA, Europe, Middle East, Australia, etc.
✅ Multi-Device Management: Free "TrackerOne" app (iOS/Android) allows tracking multiple devices with alerts and history review.
- Model: S20 | Size: 80x50x32mm | Weight: 170g
- Package: 130x90x40mm (235g) | Battery: 6000mAh rechargeable
- Indicators: Power (Red), Network (Green), GPS (Blue)
Subscription Plans:
🇺🇸 USA: 1 Month $21.99 | 3 Months $38.99 | 6 Months $66.99 | 12 Months $119.99
- Network: 2G/3G/4G LTE
- Battery Capacity: 6000mAh
- Waterproof Rating: IPx5
- Chipset: MTK2503
- Compatibility: Android & iOS
- Tracking Mode: GPS + LBS
- Subscription Required: Yes (Region-specific plans)
Share
